Road Closures

See current Road Closures in the City of Caldwell

Road Closures Displayed
This section of the Street Department website offers an overview of current and upcoming road closures associated with the City of Caldwell. Please note that road closures, resulting from other agencies, including the Department of Transportation, on roads not maintained by the city or those beyond Caldwell's city limits, will not be listed here.

Upcoming Road Closures

The map below shows all known upcoming road closures within the city limits. It provides detailed information on the locations and durations of each closure, helping residents and visitors plan their routes accordingly.

Refer to the map for specific dates on affected areas and alternative routes.

Upcoming Road Closures 2025-2026 Map(PDF, 783KB)

Current Road Closures

Effective Dates Project Details Traffic Control Plan
Feb 2 - Sep 18 Road closure on Kimball Ave from Blaine St to Chicago St.  LaRiviere will be replacing the Kimball bridge over Indian Creek.  Road barricades and information signs will be posted.  Please see the attached traffic control plan.  If you have any questions, please contact LaRiviere 971-303-3192. Kimball-Closures-All-TCPs_1.pdf(PDF, 8MB)
Aug 17 - Aug 21  Road closure on Haystack Way between Muller Dr and Hwy 20-26.  G&S Excavation will be tying in a new sewer service to the main line.  Road barricades and information signs will be posted.  Please see the attached traffic control plan.  If you have any questions, please contact G & S Excavation 208-506-0196. ROW-2494-TCP-G-and-S-Excavatoin-615-Haystack-Way-RC.pdf(PDF, 350KB)
Aug 19 - Aug 20  Road closure along Syringa Lane between S Florida Ave and S Georgia Ave.  Rocking R Excavation will be tying in a new domestic water service to the main line.  Road barricades and information signs will be posted.  Please see the attached traffic control plan.  If you have any questions, please contact Rocking R Excavation at 208-695-9031.  ROW-2505-TCP-Rocking-R-Excavation-LLC-2718-Syringa-Ln-RC.pdf(PDF, 444KB)  
Aug 19 - Sep 4  Road closure on Midway & Homedale.  Knife River will be widening the existing SH-55 corridor between Farmway Rd to Middleton Rd.  Road barricades and information signs will be posted.  Please see the attached traffic control plan.  If you have any questions, please contact Knife River at 208-362-6152. ROW-2541-TCP-Knife-River-Midway-Road-Closure-TC-Detour.pdf(PDF, 267KB)
Aug 24 - Aug 28  Road closure along Ustick Rd between Lake Ave and Florida Ave.  Das-Co of Idaho will be relocating a gas line for Intermountain Gas Company.  Road barricades and information signs will be posted.  Please see the attached traffic control plan.  If you have any questions, please contact Das-Co of Idaho at 208-463-1080. ROW-2518-TCP-Das-Co-for-Intermountain-Gas-3521-E-Ustick-Rd.pdf(PDF, 1MB)  
Sep 3 - Sep 21  Road closure along Lake Ave between Cleveland Blvd and Ustick Rd.  TEC Services will be typing in new utilities for a multifamily development at the corner of Lake Ave and Ustick Rd.  Road barricades and information signs will be posted.  Please see the attached traffic control plan.  If you have any questions, please contact TEC Services at 208-514-6031.